Environmental Impact Assessment - TP Plomin

Environmental Impact Assessment and Integrated Environmental Licencing Permit (IPPC licence) TPP Plomin C. (pdf)

Reconstruction of TP Plomin

Project of reconstruction of TP Plomin – substitution of existing TP Plomin by TP Plomin C with aim of modernisation and extension of capacity. (pdf)

Porto Montenegro - Tivat

Delivery of equipment for vodvod and sanitation, HVAC installations, separators, infrastructure preformed by ETG. (2010/2012)

Olive Residence Appartments (G11)

Installations of the heating/air conditioning VRF system, ventilation, solar system Installations of the water supply and sewage systems with installing of the facilities fir pressure raising preformed by ETG. (2009/2010)

Bar Construction Company ZIB

Construction of thermo technical installations, residential-business building, Bar Construction Co. E-3A; Po+Pr+5+Pk preformed by ETG.

Vila Apia in Budva

Construction of hydro technical installation on the building “Vila Apia” by ETG (2009).

Montenegroproject C 16 Topolica 1 Bar building

Construction of the hydro technical installations (installation of water supply and sewage systems) on the building preformed by ETG (2008/2010).

Contemporary art museum at Cetinje

Architectural design done by “ARCVS” Net area 1640 m2. Construction design of heating, air conditioning and ventilation. Preparation of design has been completed in August, and construction in December 2011 preformed by ETG.

Olympic and water polo pool in Podgorica

Installation of heating/air conditioning VRF system, ventilation of the interior space, installations for the boiling of the water for consumption and water for pool supply preformed by ETG Installation of the water supply and sewage systems with installation of the infrastructures preformed by ETG (2009)

TOYOTA - Efel Motors

Installation of the systems for heating/air conditioning VRF system, ventilation of the interior space, ejection of the smoke from garages, ventilation of the coloring chamber Installation of the water supply and sewage system with installation of multi elevator, submersible pumps, facilities for pressure raising, separator for oil and petrol (2009/2010)

Environmental Impact Assessment - TP Plomin

Environmental Impact Assessment and Integrated Environmental Licencing Permit (IPPC licence) TPP Plomin C. (pdf)

Reconstruction of TP Plomin

Project of reconstruction of TP Plomin – substitution of existing TP Plomin by TP Plomin C with aim of modernisation and extension of capacity. (pdf)

Porto Montenegro - Tivat

Delivery of equipment for vodvod and sanitation, HVAC installations, separators, infrastructure preformed by ETG. (2010/2012)

Olive Residence Appartments (G11)

Installations of the heating/air conditioning VRF system, ventilation, solar system Installations of the water supply and sewage systems with installing of the facilities fir pressure raising preformed by ETG. (2009/2010)

Bar Construction Company ZIB

Construction of thermo technical installations, residential-business building, Bar Construction Co. E-3A; Po+Pr+5+Pk preformed by ETG.

Vila Apia in Budva

Construction of hydro technical installation on the building “Vila Apia” by ETG (2009).

Montenegroproject C 16 Topolica 1 Bar building

Construction of the hydro technical installations (installation of water supply and sewage systems) on the building preformed by ETG (2008/2010).

Contemporary art museum at Cetinje

Architectural design done by “ARCVS” Net area 1640 m2. Construction design of heating, air conditioning and ventilation. Preparation of design has been completed in August, and construction in December 2011 preformed by ETG.

Olympic and water polo pool in Podgorica

Installation of heating/air conditioning VRF system, ventilation of the interior space, installations for the boiling of the water for consumption and water for pool supply preformed by ETG Installation of the water supply and sewage systems with installation of the infrastructures preformed by ETG (2009)

TOYOTA - Efel Motors

Installation of the systems for heating/air conditioning VRF system, ventilation of the interior space, ejection of the smoke from garages, ventilation of the coloring chamber Installation of the water supply and sewage system with installation of multi elevator, submersible pumps, facilities for pressure raising, separator for oil and petrol (2009/2010)

Environmental Impact Assessment - TP Plomin

Environmental Impact Assessment and Integrated Environmental Licencing Permit (IPPC licence) TPP Plomin C. (pdf)

Reconstruction of TP Plomin

Project of reconstruction of TP Plomin – substitution of existing TP Plomin by TP Plomin C with aim of modernisation and extension of capacity. (pdf)

Porto Montenegro - Tivat

Delivery of equipment for vodvod and sanitation, HVAC installations, separators, infrastructure preformed by ETG. (2010/2012)

Olive Residence Appartments (G11)

Installations of the heating/air conditioning VRF system, ventilation, solar system Installations of the water supply and sewage systems with installing of the facilities fir pressure raising preformed by ETG. (2009/2010)

Bar Construction Company ZIB

Construction of thermo technical installations, residential-business building, Bar Construction Co. E-3A; Po+Pr+5+Pk preformed by ETG.

Vila Apia in Budva

Construction of hydro technical installation on the building “Vila Apia” by ETG (2009).

Montenegroproject C 16 Topolica 1 Bar building

Construction of the hydro technical installations (installation of water supply and sewage systems) on the building preformed by ETG (2008/2010).

Contemporary art museum at Cetinje

Architectural design done by “ARCVS” Net area 1640 m2. Construction design of heating, air conditioning and ventilation. Preparation of design has been completed in August, and construction in December 2011 preformed by ETG.

Olympic and water polo pool in Podgorica

Installation of heating/air conditioning VRF system, ventilation of the interior space, installations for the boiling of the water for consumption and water for pool supply preformed by ETG Installation of the water supply and sewage systems with installation of the infrastructures preformed by ETG (2009)

TOYOTA - Efel Motors

Installation of the systems for heating/air conditioning VRF system, ventilation of the interior space, ejection of the smoke from garages, ventilation of the coloring chamber Installation of the water supply and sewage system with installation of multi elevator, submersible pumps, facilities for pressure raising, separator for oil and petrol (2009/2010)