Refined product pipeline Slavonski Brod – Bosanski Brod

The reconstruction in the existing oil pipeline corridor is planned from Terminal Slavonski Brod to the state border on Sava river within the length of 6.2 km, while from Terminal Bosanski Brod (B&H) is within the total length of approx. 13.5 km.

Offshore oil pipeline the island of Krk-land, Croatia

The new pipeline route runs about 2,6 km over the Island of Krk and continue under the sea.

HP gas pipeline Osijek – Vukovar DN 800/75 bar

The main gas pipeline Osijek-Vukovar DN 800/75 would connect in the first phase still unconnected parts of gas transmission system.

HP gas pipeline Vukovar – Negoslavci DN 800/75 bar

The HP gas pipeline Vukovar-Negoslavci together with the gas pipeline Donji Miholjac-Osijek and Osijek-Vukovar, would provide new gas pipeline 75-bar connection between eastern and western part of Croatia.

HP gas pipeline Slobodnica – Sotin DN 800/75 bar

The main gas pipeline Slobodnica – Sotin DN800/75 is intended for internal transport and connecting of gas transmission system of the Republic of Croatia and Republic of Serbia.

High pressure gas pipeline Slobodnica – Donji Miholjac DN 800/75 bar

Interconnection gas pipeline Croatia–Hungary.

High pressure gas pipeline Bosiljevo – Split DN 500/75 bar

Ekonerg is member of designing consortium of the gas transmission system of Lika and Dalmatia.

High pressure gas pipeline Lučko-Ivanja Reka DN 700/75 bar

The main gas pipeline Lučko-Ivanja Reka is passing by Croatian capital Zagreb .